Post

2 followers Follow
0
Avatar

copy to tape function

i need to schedule the copy to tape function each monthly but in schdule i didn't find this option

Aicha

Please sign in to leave a comment.

2 comments

0
Avatar

Hello Aicha,

 

You can see in the given screenshot the Daily and weekly option is grey out which means it picks the information from the Task1

Indicates that all recovery points generated within the specified retention period are copied to the same tape. For example, if you have specified the retention time for daily backup as 7, then all the recovery points from Day 1 to Day 7 are copied to the same tape. Then, all the recovery points from the next 7 days (Day 8 to Day 14) are copied to a different tape, and so on.

The recovery points from the first week (Day 1 to Day 7)) are retained for the next 7 days (Day 8 to Day 14). From Day 15, the recovery points are again copied to Tape 1 because the retention policy for first week recovery points is expired.

The following list shows the default retention time for Append to Existing Tape:

  • Daily - 7 days
  • Weekly - 5 weeks
  • Monthly - 12 months

Seven daily recovery points are copied to the same tape, five weekly recovery points are copied to the same tape, and 12 monthly recovery points are copied to the same tape.

 

https://documentation.arcserve.com/Arcserve-UDP/Available/V6.5/ENU/Bookshelf_Files/HTML/Solutions%20Guide/default.htm#UDPSolnGuide/udp_spec_schdle_arch2_tape.htm%3FTocPath%3DCreating%2520Plans%2520to%2520Protect%2520Data%7CHow%2520to%2520Create%2520a%2520Copy%2520to%2520Tape%2520Plan%7CAdd%2520a%2520Copy%2520to%2520Tape%2520Task%2520to%2520the%2520Plan%7C_____3

 

Shweta 0 votes
Comment actions Permalink